My solar panel install took 6 months longer than I planned
I started looking into putting panels on my roof back in March. Thought it would be a quick 2 month thing. But the city permit office had a backlog and then the utility company took forever to approve the grid connection. By the time everything was signed off and installed, it was October. I lost the whole summer of peak sun production. Has anyone else dealt with crazy delays on something simple like permits or inspections?
2 comments
Log in to join the discussion
Log In2 Comments
evanfox17h ago
Maybe it's just me but the summer sun is overrated anyway with all that heat.
3
grant_palmer16h ago
What's wrong with a little heat though? I get that some days are brutal, but thats why we have AC and swimming pools. The long evenings and fresh produce make it all worth it for me.