H
12
c/draftersthe_ryanthe_ryan19d ago

Had a day last Tuesday where every drawing I did seemed to fight me

I had to redo a foundation plan three times because the architect kept changing the column locations last minute. By 4pm I had erased so much my Mylar was getting shiny in spots. Anyone else have days where the redlines just keep coming?
3 comments

Log in to join the discussion

Log In
3 Comments
taylor929
taylor92919d ago
Those shin spots are the worst.
3
wright.cole
Switched to laying down a light grid on a separate overlay first. Saved me from tearing up the base sheet every time they moved something.
1
kim.wren
kim.wren18d ago
That separate overlay trick is genius, I've ruined too many base layers with last-minute changes.
1