12
Had a day last Tuesday where every drawing I did seemed to fight me
I had to redo a foundation plan three times because the architect kept changing the column locations last minute. By 4pm I had erased so much my Mylar was getting shiny in spots. Anyone else have days where the redlines just keep coming?
3 comments
Log in to join the discussion
Log In3 Comments
taylor92919d ago
Those shin spots are the worst.
3
wright.cole19d ago
Switched to laying down a light grid on a separate overlay first. Saved me from tearing up the base sheet every time they moved something.
1
kim.wren18d ago
That separate overlay trick is genius, I've ruined too many base layers with last-minute changes.
1