Warning: that one Tuesday in Gary where everything went sideways on the boiler job
Last Tuesday at the mill in Gary was the worst shift I have had in a while. We were doing a tube replacement on a recovery boiler and the tube puller jammed about 6 feet in on the third tube of the morning, so the whole crew stood around while we fought it out with a bigger slide hammer. Then the foreman found that the new tubes were short by about 2 inches on the cut sheet, which meant a reorder call to the shop and a half day lost. Around noon somebody knocked over a bucket of refractory cement near the access door and we spent 40 minutes scraping it off the floor plates before anyone could walk through. What really got me was the tags on the line, two of them said the same valve number and nobody caught it until after lunch. We still finished the day on the last tube but it took until 7:30 pm to get there. Has anyone else run into cut sheets coming in short like that, and how do you catch it before the tubes are already cut?