Tried a 6 mil poly vapor barrier under a slab pour and it bubbled up on me in Tucson
Poured a 20x24 slab for a client's detached garage out in Tucson back in March and figured I'd finally do the vapor barrier the "right" way with 6 mil poly taped at every seam. Problem is I laid it down at 6am and the sun hit it for two hours before we poured, so it got soft and wrinkled and trapped air pockets under the mud. Ended up with a few shallow blisters near the door opening that I had to float out by hand, and the client noticed them before I could even get my tools packed. Cost me about 3 extra hours and a tense conversation. Turns out the old timers around here aren't wrong about waiting til the pour is closer to lay the poly, or at least keeping it shaded. What's your go-to move for keeping that stuff flat in the heat?
Keeping it shaded is huge. I've seen guys drag a sheet of plywood over the dirt while they wait, or just park the truck so it blocks the morning sun. Even better is laying the poly in strips and leaving the roll on the shady side so you unroll as you go. That way the part you just set down gets covered by the rebar or mesh right away instead of cooking by itself. Another trick is wetting the dirt a touch before you roll it out so the poly grabs instead of sliding and puffing when you walk on it.