H
21

Am I the only one who had a drawer slide install turn into a geometry test?

Getting a set of undermounts perfectly aligned on a vanity took me from 2 pm to almost 7 because the cabinet sides weren't perfectly plumb. What's your go-to trick for this besides just shimming forever?
2 comments

Log in to join the discussion

Log In
2 Comments
evan151
evan15116h ago
Laser level and a good story of patience.
6
sandra715
sandra71511h ago
Found a cheap laser level saved my sanity on a long tiling job. It let me fix small mistakes as I went, which is the real patience test Evan151 mentioned. That little red line kept me from starting over three times.
6